Why have two dressing rooms when we can just have one co-ed room?
Dave taking a crack at "breakin' stuff" so we can redo the bathrooms.
Showoff.
The new circuit breaker panel for the backstage and upstairs areas.
Spot-a-pot?
The unnecessary "wet wall" in the shop has been removed to expand the room to it's maximum possible area.
The old circuit breaker panel that will be replaced during the renovation.
The old breaker panel removed from the wall.
Irwin Raimond "breakin' stuff".
Wall and sliding door to backstage have been removed.
Lo and behold, there used to be a shower in the rear public bathroom. Who knew? Ok, Dick Whaley knew.
Finishing demolition of the old backstage bathroom.
New panel installed in wall with feeder cables connected.
New tool closet in the workshop.
The backstage toilet is no more. And we can see the new entrance to the dressing room opening up.
Looking foward in Prop Alley.